Fitness Tracker app icon Now with the Muscle Map · Version 3.2

Train Smarter. Stay Consistent.

Log workouts, track weekly volume for every muscle, plan programs, and dial in nutrition — all in one clean, distraction-free app built for lifters.

iPhone + Apple Watch Apple Health sync No accounts
Fitness Tracker Today dashboard: weight, calories, protein, habits and progress photos
Built for real training. No accounts. No distractions. Privacy first.
Core features

Everything you need to train, track, and stay consistent.

Fast logging, weekly volume you can actually see, and powerful planning tools designed around real gym sessions.

Workout logging

Track sets, reps, and weight with last-session numbers and auto PR detection — no menu-hunting mid-lift.

Muscle Map volume

See weekly sets per muscle on a body heatmap and keep each group inside its growth zone.

Programs & planning

Build custom splits, follow a weekly schedule, and start an open workout anytime — no plan required.

Progress charts

Track weight, waist, calories, and protein with daily and weekly-average trends at a glance.

Nutrition & goals

Hit daily calorie and protein targets, then run a cut or bulk with clear goals and averages.

Habits & photos

Build streaks, log daily habits, and capture front, side, and back progress photos over time.

Built-in calculators

Macro, TDEE, 1RM, strength standards, and plate math — the numbers you need without leaving the app.

Analytics & PRs

Watch tonnage, PR history, and lift trends, plus a weekly summary of everything you logged.

New in 3.2

Train Every Muscle — Just Enough

Every set you log flows into a weekly Muscle Map. See exactly how much volume each muscle is getting on a color-coded body heatmap, and keep every group inside its growth zone.

Below
Growth zone
Above
  • Weekly sets per muscle, front and back
  • Personalized growth-zone goals (~10–20 sets/wk)
  • Tap any muscle for a full weekly breakdown
  • Split by head — upper, mid, and lower chest
Muscle Map with weekly sets per muscle and growth-zone colouring
In the app

Log it. Plan it. See it.

Four screens you'll actually live in.

Live workout log with sets, reps and completed set highlighting
01 — LOGGING

Log Workouts Fast

Start from a program or fire off an open workout with no plan at all, then log sets, reps, and weight with zero friction — built for real sessions, not menu-scrolling mid-lift.

  • Start from a program or an open workout
  • Last-session weights surfaced automatically
  • Auto PR detection and per-set notes
  • Live rest timer and clean set entry
Programs tab with a Push Pull Legs program
02 — PROGRAMS

Build Programs. Stay Consistent.

Create structured splits exactly how you train, follow a weekly schedule that checks off completed days, and watch your consistency build on a training-history heatmap.

  • Push / Pull / Legs, Upper / Lower, or your own
  • Weekly schedule with completion tracking
  • Consistency heatmap across the months
  • Program Analysis — muscle balance & fixes PRO
Progress charts for weight with 90-day trend and stats
03 — PROGRESS

See Your Progress Clearly

Visualize trends in weight, waist, calories, and protein with daily readings and a weekly-average overlay, so you can see what is actually changing over any range.

  • Weight, waist, calories, and protein charts
  • Daily plus weekly-average overlays
  • Avg / high / low and total change stats
  • 7D, 30D, 90D, 1Y, or all-time ranges
The hub with one-tap logging and tools
04 — THE HUB

Your Whole Training Life, One Tap Away

A single hub ties it all together. Quick-log a lift, meal, weight, habit, photo, or measurement, then jump to your tools, overview, and a weekly summary of everything you did.

  • One-tap logging for every metric
  • Full-body measurement tracking PRO
  • Overview of all your data at a glance
  • Weekly Summary — review your week in seconds
Live workout log Programs tab Progress charts The hub
Every screen

No feed. No clutter. No noise.

Today dashboard
Workout log
Muscle Map
Muscle detail
Progress charts
Programs
Program detail
The hub
Calculators
Apple Watch

Train From Your Wrist

Leave your phone in your bag. Run your whole session on Apple Watch — start today's workout, log every set, and let the watch track your heart rate and calories, all synced back to your iPhone in real time.

Apple Watch today view
Apple Watch exercise list
Apple Watch rest timer
Apple Watch workout metrics
  • Start today's workout
  • Track sets as you go
  • Live heart rate & calories
  • Built-in rest timer
  • Progress at a glance
Apple Health

Works With Apple Health

Fitness Tracker plugs straight into Apple Health. Your steps come in automatically, and calories, weight, and nutrition move both ways — so your data stays in sync no matter where you log it.

Fitness Tracker TWO-WAY SYNC Apple Health
StepsIMPORT
CaloriesSYNC
Active energyIMPORT
WeightSYNC
Nutrition & macrosSYNC
Built in

Calculators for Every Question

Skip the spreadsheets and web searches. The numbers lifters actually reach for are built right in and ready whenever you need them.

Macro calculator

Protein, carbs & fat from your goal.

TDEE calculator

Estimate daily calorie burn.

1RM calculator

One-rep max from any set.

Strength standards

See how you rank by bodyweight multiplier.

Plate calculator

Build or reverse-calculate bar loads.

Why this app

Built for Real Training

No social feed. No distractions. No unnecessary features. Just the tools you need to get stronger, leaner, and more consistent.

No noise

No feed, no accounts, no clutter getting between you and your training.

Fast logging

Designed so the app helps your training instead of interrupting it.

All-in-one

Workouts, muscle-map volume, nutrition, habits, and analytics in one app.

Pricing

Start free. Upgrade when you want deeper analysis.

Keep the essentials at no cost, then unlock advanced training insight with Pro.

Free

Everything you need to begin tracking consistently.

  • Workout logging & open workouts
  • Muscle Map weekly volume
  • Nutrition, calorie & protein goals
  • Weight + waist tracking
  • Apple Watch & Apple Health sync
  • Habits, photos & 1 active program
Pro

For lifters who want a deeper picture of performance and progress.

  • Everything in Free
  • Program Analysis — muscle balance & fixes
  • Lift analytics — tonnage, trends, PRs
  • Full-body measurements
  • Unlimited programs & Weekly Summary

Just $3.99/month or $32.99/year.

Start Tracking Today

Keep your training simple, measurable, and consistent. No account required.